Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:29.5
Total Flight Time:
Total Expense:$175687.69
Start/Last Date:Jan 29, 2019 - No Finish Date
Engine:Lycoming YIO-540-D4A5 RT(Y)
Propeller:Hartzell C2YR-1BFP/F8068D
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=wcooper

Home or Last Project Picture

Aug 12, 2021     Rudder Pedals and Brake Lines       Category: Flight Controls
Installed the Control Approach custom rudder pedals by Paul Grimstad. They are joined in the middle with two interlocking tubes and bolted together. They drop in the Van's Delrin blocks on the sides but the center block and AN4H-4A bolts are supplied by Paul. These bolts have a hole drilled in the bolt head to allow for safety wiring. I chose a middle position for the pedals. If needed I can adjust later. Then I connected the brake lines. They run from a reservoir on the firewall, through the firewall with an AN826-4D tee fitting, into the right seat master cylinders. Then over the top to the left seat pedals and into the parking brake valve. From the parking brake valve they run down the tunnel to the left and right side brake lines. I'm trying to make the brake line runs a neat as possible using the TSFlightlines fluidlines. So far, I think it's working out.


 